Against All Odds: How Young Engineers Built Türkiye’s First Domestic Tramway (RTE2000)
1. Introduction: The Audacious Dream of 1997
In July 1997, inside the quiet confines of Istanbul Ulaşım A.Ş.’s Esenler Maintenance Depot, an audacious industrial endeavor was born that would redefine Türkiye's transit landscape. At the time, municipal rail operations across the nation functioned strictly as maintenance centers for imported foreign fleets. Transforming a routine repair facility into a domestic Original Equipment Manufacturer (OEM) hub was viewed by industry insiders not merely as difficult, but as fundamentally impossible. When the concept of local vehicle production was broached on the shop floor, it was routinely met with skepticism and outright disbelief.
"Vehicles will never be produced in this facility."
Despite pervasive industry doubts and an impossibly aggressive delivery timeline, a small team led by two young engineers set out to challenge the status quo. What began as a seemingly utopian dream inside a depot maintenance office would ultimately yield Türkiye's first domestic tramway: the historic RTE2000.
2. The "Red Carpet Room" and the Manufacturing Blueprint Dilemma
Following his arrival at the Esenler Depot in July 1997, mechanical engineer Edip Sevinçer was stationed alongside electrical engineer Ali Aykanat in a dedicated workspace affectionately known as the "Red Carpet Room" (kırmızı halılı oda). Sevinçer spent his first month conducting a rigorous technical audit of the facility’s active ABB light rail fleet. However, the engineering team quickly encountered a stark structural reality: the depot possessed zero actual manufacturing or engineering blueprints (imalat resmi). Institutional documentation was strictly restricted to routine operational procedures and basic maintenance manuals.
The seeds of domestic production, however, had been planted years earlier. Following a organizational shift at the Istanbul Metropolitan Municipality (İBB) in 1994, local engineers and technicians successfully replaced overpriced imported passenger handrails—previously procured at inflated costs (fahiş fiyat)—with locally fabricated alternatives. This was soon followed by an ambitious project to retrofit driverless vehicles with custom, domestically built driver cabins. Replacing foreign handrails served as a crucial psychological tipping point, proving that local talent could break reliance on costly imports. While master technicians gained immense practical confidence from these retrofits, moving from component modification to building a complete rail vehicle exposed critical systemic gaps:
- Lack of Manufacturing Blueprints: Existing depot archives contained only basic preventative maintenance workflows, leaving the team without a single structural blueprint, assembly layout, or fabrication drawing required to build a railcar frame from scratch.
- Pre-existing Maintenance Mindset: Esenler was operationally structured, staffed, and culturally aligned exclusively around maintaining foreign fleet availability rather than original equipment design and assembly.
- Workshop Skepticism: While veteran shop-floor masters expressed supreme confidence in their manual trade skills ("Bring us the drawings; we'll cut, weld, and build it"), widespread doubt remained regarding whether two young engineers could actually generate full-scale OEM engineering specifications.
3. High-Tech CAD and the Paradigm Shift in Design
A pivotal technological leap occurred in late July 1997 with the arrival of a state-of-the-art computer workstation in the "Red Carpet Room." Boasting dual large-format high-resolution monitors, an ergonomic high-precision mouse, and advanced 3D CAD software, the system stood out like a "space station" amidst the depot's standard, grey CRT monitors.
Utilizing this high-powered workstation, Edip Sevinçer initiated a bold design shift. Departing from the rigid, boxy profile of the imported ABB fleet, Sevinçer leveraged 3D CAD modeling to draft sleek, aerodynamic body contours inspired by modern sports cars.
To bridge the gap between digital modeling and shop-floor reality, Sevinçer actively involved Ali Aykanat in the mechanical visualization process. Recognizing that digital designs needed to align with electrical routing and physical assembly, Sevinçer brought Aykanat directly down to the workshop bench. There, at the workbench, Sevinçer physically demonstrated to Aykanat how flat sheet metal would be bent millimeter by millimeter and where structural load-bearing welds would be executed. This hands-on collaboration allowed Aykanat to conceptualize how abstract digital contours on a screen would transform into a tangible, physical vehicle structure on the depot floor.
4. The September Surprise: An 18-Month Mandate
In late September 1997, an unexpected morning summons transformed the project overnight from an exploratory design study into an urgent corporate imperative. When informed that a critical meeting regarding local vehicle production was scheduled across the hall in Workshop Director Bilal Ekşi's office, Ali Aykanat initially hesitated. Believing his routine maintenance duties insulated him from vehicle manufacturing, Aykanat stayed behind, telling Sevinçer: "I think there's a mistake. What does new vehicle manufacturing have to do with me? My job is different." Minutes later, Sevinçer returned to the Red Carpet Room with a clear message: "Brother, they're waiting for you too." Grabbing his notebook, Aykanat stepped across the hall into history.
Strategic Decision Matrix & Meeting Outcomes
- Executive Leadership Present: The meeting was chaired by General Manager Abdurrahman Gündoğdu, alongside Deputy GM Ömer Yıldız, Purchasing Manager Emin Karaköse, Workshop Director Bilal Ekşi, mechanical engineer Edip Sevinçer, and electrical engineer Ali Aykanat.
- The Non-Negotiable Mandate: General Manager Abdurrahman Gündoğdu outlined Istanbul's expanding rapid transit expansion and officially launched the local prototype project. He set an aggressive target: the vehicle had to be fully operational on active tracks before the April 1999 local elections—leaving less than 18 months for complete execution.
- Clear Division of Responsibility: Edip Sevinçer was appointed lead for structural design, manufacturing drawings, and Esenler mechanical production. Ali Aykanat was assigned total responsibility for electrical architecture, electronic systems, and harness wiring. Executive administrative project management was placed under Purchasing Manager Emin Karaköse.
- Institutional Trust Over Hierarchy: When Aykanat openly questioned why such a monumental undertaking was being assigned to two young engineers instead of seasoned industry veterans, leadership offered unwavering backing: "We trust you, you'll do it."
- Pragmatic Engineering & Operational Necessity: With less than 1.5 years to deliver, custom traction control software or long-lead international propulsion orders were impossible. The team adopted a pragmatic technical strategy: utilize spare ABB traction components available in the depot's maintenance inventory. Crucially, this was an absolute operational prerequisite: to operate seamlessly on the active line, the prototype had to run in double-traction synchronization with existing fleet units.
5. Building the Team and the Esenler Workshop Legacy
With executive authorization secured, assembling an execution team became paramount. The engineering unit was built almost entirely from scratch, recruiting fresh university graduates and part-time senior engineering students who acquired practical vehicle assembly skills directly on the shop floor. To assist with the expanding electrical wiring scope, an additional newly graduated electrical engineer joined Aykanat's team in December 1998.
Workshop Director Bilal Ekşi allocated dedicated floor space inside the main facility and reassigned key technicians from previous cabin retrofit projects, ensuring that routine fleet maintenance schedules remained entirely uncompromised.
Historic Esenler Workshop Milestone
The structural chassis and body shell of the RTE2000 stands as the first and only vehicle body ever fully manufactured inside the Esenler Maintenance Workshop. While subsequent transit prototypes were developed by the authority in later years, no other rolling stock body was fabricated entirely within this maintenance facility.
During the initial planning sessions, when the young engineers candidly raised their complete lack of manufacturing facility experience—noting they had never even visited an operational railcar assembly plant—leadership responded with characteristic pragmatism: "You'll see it in France!" referring to upcoming technical training trips to Alstom's facilities for the Taksim metro project.
6. Key Takeaways: Lessons in Institutional Courage & Engineering Leadership
From its initial draft drawings under the working title "Boğaziçi" to its official operational launch as Railway Transport Equipment (RTE) on March 25, 1999, the RTE2000 project remains a masterclass in industrial agility. The institutional capability established during this program laid the groundwork for multi-generational domestic rail platforms, leading directly to modern 5th-generation projects such as TRAM34.
- Institutional Courage & Trust in Youth
- Executive leaders achieved industrial breakthroughs by bypassing conventional institutional inertia and placing complete operational trust in ambitious young engineers.
- Pragmatic Engineering Under Extreme Constraints
- When rigid delivery windows preclude custom, ground-up component development, leveraging proven existing inventory (such as depot ABB spare parts) can yield a fully operational, network-compatible prototype.
- Bridging Design and the Shop Floor
- High-tech tools like 3D CAD are only as effective as their execution; success requires design engineers to work shoulder-to-shoulder with technicians at the workbench to translate digital models into physical structures.
- Foundational Capabilities Drive Long-Term Innovation
- Scrappy, highly constrained early-stage projects build internal engineering confidence, organizational know-how, and domestic supply networks that serve as the foundation for decades of future technology platforms.
7. Conclusion & Call to Engagement
The narrative of the RTE2000 demonstrates how a venture initially dismissed as mere "ignorant courage" (cahil cesareti) was transformed through pragmatic engineering, technical resourcefulness, and steadfast leadership into a watershed moment for Türkiye's rail transportation industry.
How does your organization foster institutional courage when facing seemingly impossible deadlines?